Roof Shingles Ridge Installation
In summary to install the ridge cap shingles you simply separate them where they are perforated bend them over the peak and nail them down.
Roof shingles ridge installation. Bend single tabs or special ridge shingles over the ridge beginning at the end putting a bead of asphalt under the first ridge shingle to hold down the tab. Step 2 confirm that the ridge cap shingles will cover the nails of the overlapping shingles. With new laminated hip and ridge cap shingles finishing a roof installation with a ridge cap is a much simpler process than with the old three tab shingles. To cover the ridge install vented cap shingles or continuous ridge vent.
Line up the edges with the chalk line and secure with 2 roof nails right above the adhesive line on the shingle tab. Items 1 12 of 74. Britmet lightweight metal roof shingle slimline angle ridge bramble brown. Integrity roofing and painting llc video demonstrates how to get an added layer of protection on the ridge.
Continue shingling up both sides of the roof until a row of shingles from each side of the roof extends over the peak of the building. Each shingle tab is used to form a ridge shingle. View as grid list. Price per item inc vat.
Cut each ridge shingle from the shingle and cut to shape as shown. Continue along the ridge of the roof until you have all of the shingles secured. The ridge shingle should be applied in the opposite direction of the prevailing wind. Price per item inc vat.
An aluminum ridge vent has a mushroom shaped profile combined with a wide flange on both sides that sits on top of the roof shingles. Britmet lightweight metal roof shingle slimline angle ridge moss green. A shingle over vent is installed over the ridge of a roof and is covered over by asphalt shingle caps that match the surrounding roof shingles. Roof installation trick for ridge cap.
Start at one of the eaves of the ridge and wrap a shingle around the ridge of the roof. Nail these rows of shingles near the peak of the roof on both sides overlapping the peak. This means ridges should be cut when they meet the central point. The shingle should be in the center of the ridge.
To speed up installation use pre formed hips and ridges. Nail it where the next ridge shingle will cover the nails about an inch horizontally and vertically. Step 8 the complete shingle roof.